Banner 10

Completed projects

Alimini Project

Hydrodynamics study of "Alimini Grande" basin (Puglia) carried out in 2007 for the Project: "Feasibility study for the fresh water spill of the Carpignano Salentino water treatment plant in the "Zuddeo" channel, tributary of the lake "Alimini Grande" (Lecce, Apulia, Italy)"

Marano and Grado Project

Hydrodynamic and sediment transport in the Marano and Grado lagoons

OPA Project

Optimization of traditional and low environmental impact methods for antifouling protection of boats

TAECO Project

Realization of a mixed (Research Bodies / Companies) laboratory for the study of environmentally-friendly antifouling technologies for the nautical field

e-Audit Project

The project E - Audit examines the issue of energy consumption on board fishing vessels. The Energy Audit is the fulcrum of an energy assessment that aims to understand how energy is used on board, what are the possible causes of waste and if so, what measures can be suggested to the fishing industry. The energy plan must not only assess the technical feasibility but also the viability of proposed actions. The Energy Audit of the fishing fleet is a systematic set of surveys, collection and analysis parameters for the specific consumption and the operating conditions of fishing vessels. It is defined as a "technical and economic evaluation of energy flows." Its goals are to: 1) define the energy balance of the vessel; 2) identify the steps of technological upgrading; 3) to evaluate each project technical and economic opportunities; 4) improve the comfort and safety.

MOLEVAR Project

Pilot Project for the soft Crabs production by Carcinus aestuarii: POTENTIAL ECONOMY FOR VARANO LAGOON"
Document Actions